Verifying Installation and Operation
Verifying Installation and Operation

Verifying Installation and Operation

After installation the user should verify the installation.
Ensure the device is connected to the network, with at least one other PTT Express enabled device and perform the following tests to confirm successful operation:
  1. Confirm that a Group Broadcast, or page communication can be initiated and that other devices receive the spoken voice from the originating device.
  2. Once a Group Broadcast communication has been successfully established, confirm that a page-to-private, or Private Response, can be established.
  3. While in a WAN call, ensure that page communication cannot be heard.