Preparing the base

Preparing the base

This section describes the process of placing the cables in the stand base.
  1. Place the AC/DC power adapter in the base.
    Placing the power adapter into the stand base.
  2. Remove a cable exit cover.
    Pulling cable cover off of the base.
  3. Route the AC cable through the base and connect it to the power adapter.
    Power adapter connecting to the AC cable., inside the stand base.
    If your setup requires any additional cabling (such as an Ethernet or USB-C cable), route them through the base as well.
  4. Replace the cable exit cover.