Solutions
Hardware
Software
Services
Support and Downloads
About Zebra
SC-2000 Stand Installation Guide
Preparing the base
SC-2000
SC-2000
Overview
Configurations
Dual Monitor Countertop Features
Single Monitor Countertop Features
Preparing the base
Assembling the Single Monitor Countertop Stand
Assembling the Dual Monitor Countertop Stand
Mounting the KC50
Mounting the TD50
Preparing the base
Preparing the base
This section describes the process of placing the cables in the stand base.
Place the AC/DC power adapter in the base.
Remove a cable exit cover.
Route the AC cable through the base and connect it to the power adapter.
If your setup requires any additional cabling (such as an Ethernet or USB-C cable), route them through the base as well.
Replace the cable exit cover.