The input power required to support the devices should be determined in terms of a budget, with a fixed electrical current required for each supported device. Integrators should consult the scanner specification sheets available on
zebra.com/support, for all follower devices connected as part of the Connectivity Gateway. Select a 24V DC Power Supply to provide sufficient current to handle all connected follower devices.