zebra-logo

  • Solutions
  • Hardware
  • Software
  • Services
  • Support and Downloads
  • About Zebra
  1. GS20 Connectivity Gateway Leader Module
  2. Installation
  • GS20 Leader Module
  • GS20 Leader Module
  • About this Guide
    • Notational Conventions
    • Icon Conventions
    • Service Information
    • License Agreement
  • Getting Started
    • Specifications
    • Accessories
      • Compatible PLC Devices
  • Installation
    • GS20 Dimensional Drawings
    • Torque Specification
    • Power Sources
      • 12 Pin M12 Power Input
      • Power Over Ethernet
    • Grounding for Electro-Magnetic Compliance and ESD Safe
    • Cable Pin Outs
      • Power and IO Connector
      • Ethernet Connector
    • Power Requirements
      • Selecting a 24V Power Supply
      • Selecting a PoE Switch
      • Ethernet Switch Requirements
    • Setting Up the Device
      • Mounting Instructions
      • Mounting the Device Using the L-Bracket Accessory
      • Mounting Bracket Dimensions
    • Connecting Follower Devices
      • Connecting Follower Devices using TCP/IP
      • Connecting Follower Devices Using GPIO
    • Gateway Licensing
  • Using the Device
    • User Interface
      • User Interface Label
    • LED and Beeper Indications
    • GPIO and Opto-Coupled GPIO
      • GPIO Wire Diagrams
    • Thermal Management
    • Updating Device Firmware
      • Firmware Update
      • Updating Firmware Using Web HMI
    • Performing a Factory Reset
  • Software Overview
    • GS20 Web HMI Features
    • Device Compatability with Zebra Aurora Focus
    • Network Setup
    • Accessing the GS20 Web HMI
      • UI Overview
      • Navigation
        • Using the Bottom Navigation Menu
      • Configuring Network Settings
    • Configuring Follower Devices
      • Adding Follower Devices in the Web HMI
      • Configuration Overview
    • Setting Up the Result Output
    • Using a Manual Trigger
    • Setting Up TCP/IP Trigger Settings for TCP/IP Triggered Mode
      • Setting Up GPIO Triggering
    • Changing Ports Between the Remote Host and the Leader Device
    • Configuring Communication Settings for Follower Devices
      • Setting Up Continuous Mode
    • Setting Up TCP/IP Triggering
    • Setting Up Serial Triggering
      • Sending Results to the Host Over Serial and TCP/IP
      • Setting Leader to Host Delay
    • Setting Up a PLC Device
      • Creating a PLC Device
      • Controlling a PLC Device
      • Triggering with the PLC Device
      • Sending Results to the PLC Device
    • Setting Up a Modbus Device
    • Configuring GPIO on the Device
      • Setting Up GPIO Triggering
      • Setting Up GPIO Pass/Fail
      • GPIO Mirroring
      • String Filtering
      • Failure Timeout
      • Run Mode
    • Configuring the Number of Entries in the Database
      • Database Configuration
    • Setting Attributes
    • Viewing Output Data and Interpreting Stats
      • Setting Alerts
    • Using Zebra Easy Text Interface
    • Using Split Code Functionality
      • Configuring Follower Settings for Split Code
      • Configuring Split Code
  • Troubleshooting
    • Communicating With the Device
      • Pinging the Device via IP
      • Pinging the Device via Hostname
    • Device Discovery Troubleshooting Methods
      • Factory Reset the Device
      • Power Cycling the Device
    • Communication Port Usage
    • Obtaining the Device's IP Address
    • Editing Ethernet Port Adapter Options
Installation

Installation

GS20 Dimensional Drawings
Torque Specification
Power Sources
Grounding for Electro-Magnetic Compliance and ESD Safe
Cable Pin Outs
Power Requirements
Setting Up the Device
Connecting Follower Devices
Gateway Licensing

Legal | Terms of Use | Privacy Policy

ZEBRA and the stylized Zebra head are trademarks of Zebra Technologies Corp., registered in many jurisdictions worldwide. All other trademarks are the property of their respective owners. ©2025 Zebra Technologies Corp. and/or its affiliates.