Description | Requirement | Zebra Part Number | Description |
---|---|---|---|
Power Supply, 24V DC | A power supply or combination of power supplies with the total current/power rating to power a GS20 device plus connected follower devices is required to power GS20 and follower devices via 24V. You do not need this accessory if you choose to use a PoE switch. | PWR-24V03A-0000 | Allen Bradley 1606-XLE80E Power Supply, 24V DC, 3.3A, 80 W
![]() |
PWR-24V05A-0000 | Allen Bradley 1606-XLE120E Power Supply, 24V DC, 5A, 120
![]() | ||
PoE Injector | PWR-POE30W-0000 | Power over Ethernet Injector, 30W POE+, AC Input ![]() | |
Power Cable | An A-Coded 12-pin female M12 connector to flying leads is necessary for the GS20 Leader Module and each follower device. | CBL-PWR00500-M1200 | Power Cable, 5m (16 ft.) |
CBL-PWR01500-M1200 | Power Cable, 15m (49 ft.) | ||
Ethernet Switch | A compatible Ethernet switch must have a total number of ports equal to the following: The number of ports (1 for GS20) + number of followers + (1 for an external host) + (1 for the PLC device) + (1 for PC to set up). The number of ports = (1 for GS20) + the number of followers + (1 for an external host) + (1 for the PLC device) + (1 for PC to setup) The GS20, follower devices, PC, external host (optional), and PLC (optional) must be connected to the same network. If you are using Power over Ethernet to power the GS20 and follower devices, ensure that your Ethernet switch is compatible with their specifications. A Class 4 PoE+ source is recommended. | - | - |
Leader and Followers Ethernet Cables | An X-Coded male M12 connector to a standard male RJ45 connector Ethernet cable is required for the GS20 and each follower device. These connect the GS20 and follower devices to the Ethernet switch. | CBL-ENT00100-M120 | Ethernet Cable 1M, X-Coded M12 to RJ45, Standard Flex |
CBL-ENT00300-M1200 | Ethernet Cable 3M, X-Coded M12 to RJ45, Standard Flex | ||
CBL-ENT00500-M1200 | Ethernet Cable 5M, X-Coded M12 to RJ45, Standard Flex | ||
CBL-ENT01500-M1200 | Ethernet Cable 15M, X-Coded M12 to RJ45, Standard Flex | ||
Standard Ethernet Cable | A standard male RJ45 to male RJ45 Ethernet cable is required to connect an Ethernet Switch to the PC. A cable is necessary for the external host and the PLC. | - | - |
Terminal blocks | Terminal blocks are required for GS20 and follower devices. Additional terminal blocks are necessary if the Connectivity Gateway uses GPIO triggering between the leader and follower devices. Refer to the pin-out diagram of the 12-pin M12 of the GS20 device and follower devices in the GS20 Connectivity Gateway Leader Module User Guide. | - | - |
PLC (if used) | Use a supported PLC device with the Connectivity Gateway. An RJ45 male Ethernet cable is required to connect the PLC to the Ethernet switch. | - | - |
Serial (if used) | Use a DB9 RS232 breakout connector or a supported equivalent to establish serial communication from the GS20 device. Refer to the pin-out diagram of the 12-pin M12 of the GS20 device in the GS20 Connectivity Gateway Leader Module User Guide to ensure proper installation. | - | - |
GPIO input trigger device (if used) | A compatible cable ending in flying leads is required (CBL-SNS0500F-M1200) for sending an input trigger via GPIO to an external device (for example, a break beam sensor). | - | - |
Part Number | Description |
---|---|
CBL-ENT00100-M1200 | Cable, Ethernet 1M, X-Coded M12 to RJ45, standard flex |
CBL-ENT00300-M1200 | Cable, Ethernet 3M, X-Coded M12 to RJ45, standard flex |
CBL-ENT00500-M1200 | Cable, Ethernet 5M, X-Coded M12 to RJ45, standard flex |
CBL-ENT01500-M1200 | Cable, Ethernet 15M, X-Coded M12 to RJ45, standard flex |
CBL-PWR00500-M1200 | Cable, power 5M, 12 Pin M12 to flying leads, standard flex |
CBL-PWR01500-M1200 | Cable, power 15M, 12 Pin M12 to flying leads, standard flex |